Sign In | Join Free | My rc363.com
China Foshan Glawall Building Materials Co., Ltd logo
Foshan Glawall Building Materials Co., Ltd
Your trusted space solution expert
Verified Supplier

2 Years

Home > Glass Partition Wall System >

Movable Partition Wall Smoothly Sliding Extra High Panel Customized Color Size Material

Foshan Glawall Building Materials Co., Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Movable Partition Wall Smoothly Sliding Extra High Panel Customized Color Size Material

Brand Name : Glawall

Model Number : 100mm ultrahigh style

Certification : SGS, ISO 9001,UL, CE

Place of Origin : China

MOQ : 10 square meters

Price : US$80.00 10 - 99 square meters

Payment Terms : L/C,D/A,D/P,T/T,Western Union

Supply Ability : 3000 square maters per month

Delivery Time : 2-3 weeks

Packaging Details : wooden package

Material : Aluminum frame+glass panel

Transparency : Clear

Customizable : size, accessories

Competitive price : yes

Panel Thickness : 60mm, 100mm

glass type : strong tempered glass

Frame Material : Aluminum

Advantage : Competitive price, good service, high professional, quality guarantee

Contact Now

Movable Partition Wall Smoothly Sliding Extra High Panel Customized Color Size Material


Installing an extra-high movable partition wall (4 meters or taller) requires meticulous planning, specialized tools, and adherence to structural and safety standards. Below is a step-by-step guide to the installation process, key considerations, and best practices for ensuring stability, functionality, and aesthetic integration.

1. Pre-Installation Planning

A. Site Assessment and Design Review

  • Measurements:
    • Confirm ceiling height, floor-to-ceiling dimensions, and room geometry (e.g., straight vs. L-shaped layouts for corner-turning systems).
    • Check for obstructions (e.g., beams, ducts, pillars) that may require custom track configurations.
  • Structural Compatibility:
    • Ensure the ceiling can support the weight of the track system and panels (typically 50–100 kg per linear meter for ultrahigh models).
    • For concrete or steel ceilings, verify load-bearing capacity with a structural engineer. For drywall ceilings, reinforce with steel channels or plywood backing.
  • Design Documentation:
    • Review manufacturer drawings (e.g., track layouts, panel dimensions) and confirm compatibility with the space.


B. Material and Tool Preparation

  • Key Materials:
    • Track system (aluminum or steel, pre-cut to length).
    • Partition panels (pre-fabricated with acoustic/fire-resistant cores).
    • Hardware: Rollers, hinges, pivot joints, safety sensors, and motorized components (if applicable).
  • Tools:
    • Laser level, tape measure, and chalk line for alignment.
    • Power tools: Drill, impact driver, angle grinder, and scaffolding/lift for high ceilings.
    • Safety gear: Hard hat, safety glasses, and fall arrest equipment for working at heights.


Movable Partition Wall Smoothly Sliding Extra High Panel Customized Color Size Material


2. Installation Steps


A. Track System Installation

B. Panel Assembly and Hanging

C. Motorization and Safety Features (if applicable)

D. Sealing and Finishing

Step 1: Mark Track Position


  • Use a laser level to mark the ceiling track route, ensuring it is straight and level. For corner-turning systems, mark 90° angles or curved paths (if applicable).
  • For dual-track systems (common in ultrahigh partitions), mark both the upper load-bearing track and lower guide rail (to prevent panel sway).
Step 1: Assemble Panels (if pre-fabricated)


  • Some systems ship panels in sections; assemble them using manufacturer-provided connectors (e.g., tongue-and-groove joints, metal clamps).
  • Attach rollers or carrier units to the top of each panel (these engage with the ceiling track).
Step 1: Install Motorized Drives


  • Mount electric motors or gear drives to the track (typically at the start/end of the track for linear systems).
  • Connect motors to a control panel or remote interface (e.g., touchscreen, IoT hub).
Step 1: Acoustic and Weather Sealing


  • Insert rubber gaskets or brush seals between panels and at the top/bottom edges to improve soundproofing (STC rating) and airtightness.
  • For fire-rated partitions, install intumescent strips (expand when heated to seal gaps during a fire).
Step 2: Mount Track to Ceiling


  • Concrete/Steel Ceilings:
    • Drill holes for anchors (e.g., wedge anchors, toggle bolts) and secure the track using M8–M10 screws or bolts.
    • Use a spirit level to adjust the track for perfect horizontal alignment.
  • Wood/Drywall Ceilings:
    • Install steel or wooden support channels between ceiling joists to distribute weight, then attach the track to the channels.
Step 2: Hang Panels on Track


  • Using a hoist or lift, raise each panel into position and hook the rollers onto the track.
  • For corner-turning systems, install pivot hinges at panel intersections to enable smooth rotation around corners.
  • Ensure panels are vertically plumb using a plumb bob or laser level.
Step 2: Integrate Safety Sensors


  • Install infrared sensors or pressure-sensitive strips on panel edges to stop movement if obstacles are detected (critical for compliance with safety codes like EN 16005).
  • Test sensor responsiveness by triggering them with a hand or object; ensure panels halt immediately.


Step 2: Trim and Aesthetic Finishes


  • Install decorative moldings or baseboards to cover track edges and guide rails.
  • For glass partitions, apply edge trims or 贴膜 (tint/etching) for safety and design consistency.
Step 3: Install Lower Guide Rail (if required)


  • Secure a floor-mounted guide rail along the path of the partition to stabilize panels at the base.
  • Ensure the guide rail is aligned with the ceiling track to prevent binding.
/ / /




Movable Partition Wall Smoothly Sliding Extra High Panel Customized Color Size Material


3. Testing and Calibration

A. Functional Testing

  • Manual Operation: Slide panels manually to check for smooth movement, no binding, and even weight distribution.
  • Motorized Operation: Test electric drives for speed, noise levels, and stopping precision. Adjust motor torque if panels move too fast/slow.
  • Corner Turning (if applicable): Navigate panels around corners to ensure pivots rotate smoothly and tracks align correctly.


B. Safety and Compliance Checks

  • Load Test: Apply gentle horizontal force to panels to ensure they remain stable (no wobbling or track detachment).
  • Sound and Fire Testing:
    • Conduct an STC test using a sound meter to verify acoustic performance.
    • For fire-rated systems, ensure all components (e.g., seals, tracks) meet required fire resistance ratings (e.g., ASTM E119).
  • Code Compliance: Verify with local building authorities that the installation meets structural, electrical, and accessibility codes (e.g., ADA for handle heights).



4. Common Challenges and Solutions

Challenge Solution
Uneven Ceilings/Floors Use adjustable brackets or shims to level the track; grind down high spots on floors.
Excessive Panel Weight Ensure the ceiling structure is reinforced; use counterbalance systems for heavy panels.
Noise During Movement Lubricate rollers and tracks with silicone-based lubricants; add felt pads to panel joints.
Alignment Issues in Corners Pre-test corner tracks with dummy panels; adjust pivot angles before final installation.


Movable Partition Wall Smoothly Sliding Extra High Panel Customized Color Size Material


5. Maintenance and Best Practices

  • Regular Lubrication: Oil rollers and hinges every 6–12 months to prevent friction.
  • Track Cleaning: Remove debris (dust, paint chips) from tracks to avoid jams.
  • Annual Inspections: Check for loose screws, worn seals, and motor performance; replace parts as needed.
  • Training: Provide operators with guidelines for safe use (e.g., avoiding abrupt stops, not exceeding weight limits).


6. Manufacturer-Specific Considerations

  • Follow Instructions: Always refer to the manufacturer’s installation manual (e.g., Hufcor, Dorma Hüppe) for model-specific steps (e.g., unique track profiles, panel locking mechanisms).
  • Warranty Compliance: Improper installation may void warranties, so ensure certified technicians handle the work.

Example Installation Timeline

Stage Duration
Site Assessment 1–2 days
Track and Rail Installation 2–3 days (for a 20m straight run)
Panel Hanging and Motorization 1–2 days
Testing and Calibration 1 day


Installing an ultrahigh movable partition wall is a specialized process that demands precision and expertise. Hiring a certified installation team with experience in high-load systems is critical to ensuring safety, functionality, and long-term performance. Always prioritize structural integrity and code compliance to avoid costly (rework) or safety hazards.


Movable Partition Wall Smoothly Sliding Extra High Panel Customized Color Size Material


Product Tags:

customizable extra high movable partition wall

      

customized color movable partition wall

      

smoothly sliding movable partition wall

      
China Movable Partition Wall Smoothly Sliding Extra High Panel Customized Color Size Material wholesale

Movable Partition Wall Smoothly Sliding Extra High Panel Customized Color Size Material Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Foshan Glawall Building Materials Co., Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0